Transport Tanks



  • Transport Tanks
  • Features
  • Option
  • Stock List
  • Inquiry
  • Transport tank for LIN, LOX & LAR service
  • Rugged design for optimized & maximum payload
  • Reliable support system for rough road conditions
  • Efficient Perlite or Multilayer Super Insulation ensures better efficiency
  • Ease of access, operation & maintenance with ergonomic pipe work
  • Inner Vessel Stainless Steel SS304
  • Pneumatic and Mechanical suspension system
  • Optimization of Pay Load based on Chasis Mounted and Primor GBW
  • Rugged & ergonomic rear operational valve box cabinet
  • High quality surface & paint finish
  • Inner Vessel safety valve with flow diverter valve for maintenance without depressurization
  • Sampling point
  • Cavitation free plumbing and SS body valves
  • Bellow sealed vacuum probe valve with gauge tube covered for protection
  • SS lifting hooks
  • Low pressure tanks fitted with transfer pupms
  • Cold test with Liquid Nitrogen
  • Rupture discs or Safety valves as secondary safety device
  • Fire control or Emergency shutoff valve
  • Flow meter and Printer
  • Stainless Steel Outer Vessel
  • Additional isolation valves in liquid lines(M1A, M3A)
  • Noise eliminator
  • Stainless Steel braided hose, suitable for O2 Service (~4m)
  • Flexibility of design codes (European, American, Australian)
  • Perlite insulation
  • Spare Wheel
 
         
Capacity (Ltrs)
Pressure (KG/Cm2 g)
Design Code
Expected Readiness
Qty. (Nos.)
VERTICAL STORAGE TANK
4,000
17
EN -13154
4~6 weeks
5
6,000
17
EN -13154
4~6 weeks
6
6,000
38
EN -13154
6~8 weeks
2
10,000
17
EN -13154
6~8 weeks
4
10,000
17
AS1210
~ 2 weeks
1
20,000
17
EN -13154
6~8 weeks
2
20,000
16
PED
~ 2 weeks
2
20,000
24
EN -13154
6~8 weeks
1
30,000
17
AS1210
~ 2 weeks
1
6,000
17
ASME
Ready
1
10,000
24
EN -13154
4~6 weeks
1
13,000
24
EN -13154
4~6 weeks
1
10,000
18
EN -13154
Ready
1
6,000
17
EN -13154
Ready
1
 
29
Transport /Frame Tank
 
10,000
5
ADM
6~8 weeks
2
16,000
18
EN -13154
6~8 weeks
2
20,000
17
ADM
~ 2 weeks
2
8,000
17
ADM
~ 2 weeks
1
 
5
Portacryo
 
900
34
ADM
~ 2 weeks
8
General Information
Your Name
:
*
Company name
:
*
Address
:
City
:
Zip Code
:
Country
:
*
Phone no
:
*
Email
:
*
Technical Information
Gross capacity
:
Pressure
:
Quantity
:
 
Service
:
 
Configuration
:
 
Design code/certification
:
 
Pump connection
:
 
Applications
:
Requirement
:
 
Purchase decision
:
 
Required delivery period
:
(weeks from PO date)
Country of installation/use
:
 
Nearest airport
:
 
Nearest seaport
:
 
Notes
:
 
Security Code
:
   
If you are interested in any other Product, please click one of the following links!


* These are general feature and are liable to change on subsequent revision and updation without prior notice.