Storage Tanks



  • Storage Tanks
  • Features
  • Option
  • Stock List
  • Inquiry
  • Cryogenic liquid storage vertical customer station for LIN, LOX, LCO2 & LN2O Service
  • Perlite/ Super Insulation ensures low evaporation rate & minimizes heat influx
  • High Performance & extended hold time for lower life cycle cost
  • Ergonomically designed piping layout for ease of access & operation
  • Inner vessel Stainless Steel SA240 TP 304
  • Cost effective cold stretched inner vessel designed as per ASME And EN standards
  • Unique thermally efficient internal support design
  • Outer Vessel Heads and Shell Material: Carbon Steel
  • Cleaned for oxygen service
  • High quality polyurethane paint provides durability & impressive aesthetics
  • TIG welded 304 stainless steel piping ensures reliability and longer life
  • Dual inner vessel safety devices: Diverter valve with 2 relief valves and 2 burst disks, standard
  • Stainless Steel cryogenic valves standard on all tanks. All Safety valves and regulators are bronze body
  • New easy access multi-functional cryo regulator serves as pressure regulator & economizer which eliminates many in-field adjustment problems
  • Efficient Aluminum star fin design pressure building coil
  • Integral Shipping legs for support during transportation
  • Designs in accordance with other international codes
  • LNG & LCO2 Service available on request
  • Easy to install telemetry unit, liquid level and pressure transmitters
  • Thermosyphon option
  • 2nd Set of Relief valves as secondary safety devices 
  • Auxiliary liquid and gas connections and valves 
  • Customized filling and delivery connections
  • Customer specific piping, valves and accessories upon request
  • Horizontal bulk tanks available
      
         
Capacity (Ltrs)
Pressure (KG/Cm2 g)
Design Code
Expected Readiness
Qty. (Nos.)
VERTICAL STORAGE TANK
4,000
17
EN -13154
4~6 weeks
5
6,000
17
EN -13154
4~6 weeks
6
6,000
38
EN -13154
6~8 weeks
2
10,000
17
EN -13154
6~8 weeks
4
10,000
17
AS1210
~ 2 weeks
1
20,000
17
EN -13154
6~8 weeks
2
20,000
16
PED
~ 2 weeks
2
20,000
24
EN -13154
6~8 weeks
1
30,000
17
AS1210
~ 2 weeks
1
6,000
17
ASME
Ready
1
10,000
24
EN -13154
4~6 weeks
1
13,000
24
EN -13154
4~6 weeks
1
10,000
18
EN -13154
Ready
1
6,000
17
EN -13154
Ready
1
 
29
Transport /Frame Tank
 
10,000
5
ADM
6~8 weeks
2
16,000
18
EN -13154
6~8 weeks
2
20,000
17
ADM
~ 2 weeks
2
8,000
17
ADM
~ 2 weeks
1
 
5
Portacryo
 
900
34
ADM
~ 2 weeks
8
  
General Information
Your Name
:
*
Company name
:
*
Address
:
City
:
Zip Code
:
Country
:
*
Phone no
:
*
Email
:
*
Technical Information
Gross capacity
:
Pressure
:
Quantity
:
 
Service
:
 
Configuration
:
 
Design code/certification
:
 
Pump connection
:
 
Applications
:
Requirement
:
 
Purchase decision
:
 
Required delivery period
:
(weeks from PO date)
Country of installation/use
:
 
Nearest airport
:
 
Nearest seaport
:
 
Notes
:
 
Security Code
:
   
If you are interested in any other Product, please click one of the following links!


* These are general feature and are liable to change on subsequent revision and updation without prior notice.