Micro Bulk System



  • Micro Bulk System
  • Features
  • Option
  • Stock List
  • Inquiry
  • Portable Cryostorage units suitable for LIN, LOX, LAR & LCO2 service
  • Rugged steel frame protects all sides
  • Highly efficient super insulation ensures efficient performance
  • Special design ensures low filling losses
  • Long stem globe valves provide ease in operation
  • "Ready to use" units in vertical and horizontal options
  • Combines all features of a customer station tank and liquid cylinder
  • Product portability supports the option of being filled by Transport tanks at customer location / sites OR carried to ASU / bulk storage locations for filling
  • Convenient handling by forklift, mobile crane, chain pulley or overhead crane
  • High capacity regulator & PBU ensures continuous gas delivery with high purity
  • Optional product vaporiser mounted on frame, provides continuous gas supply
  • Steel plate frame protects valves, gauges and piping
  • Stable base, for placing on levelled surface. Civil foundation not essential
  • Ideal for 'temporary user points' application
  • 100 mm (4") dia level & pressure gauge provide accurate measurement
  • Flow diverter valve provides safety valve isolation for maintenance
  • Frame mounted product Vaporiser or distribution manifold
  • Rupture disc as secondary safety devices
  • Customized filling and delivery connections
  • Vacuum gauge tube
  • Digital level measurements
  • Check valve in filling line
  • Stainless Steel outer vessel
  • LNG Service

 
         
Capacity (Ltrs)
Pressure (KG/Cm2 g)
Design Code
Expected Readiness
Qty. (Nos.)
VERTICAL STORAGE TANK
4,000
17
EN -13154
4~6 weeks
5
6,000
17
EN -13154
4~6 weeks
6
6,000
38
EN -13154
6~8 weeks
2
10,000
17
EN -13154
6~8 weeks
4
10,000
17
AS1210
~ 2 weeks
1
20,000
17
EN -13154
6~8 weeks
2
20,000
16
PED
~ 2 weeks
2
20,000
24
EN -13154
6~8 weeks
1
30,000
17
AS1210
~ 2 weeks
1
6,000
17
ASME
Ready
1
10,000
24
EN -13154
4~6 weeks
1
13,000
24
EN -13154
4~6 weeks
1
10,000
18
EN -13154
Ready
1
6,000
17
EN -13154
Ready
1
 
29
Transport /Frame Tank
 
10,000
5
ADM
6~8 weeks
2
16,000
18
EN -13154
6~8 weeks
2
20,000
17
ADM
~ 2 weeks
2
8,000
17
ADM
~ 2 weeks
1
 
5
Portacryo
 
900
34
ADM
~ 2 weeks
8
General Information
Your Name
:
*
Company name
:
*
Address
:
City
:
Zip Code
:
Country
:
*
Phone no
:
*
Email
:
*
Technical Information
Gross capacity
:
Pressure
:
Quantity
:
 
Service
:
 
Configuration
:
 
Design code/certification
:
 
Pump connection
:
 
Applications
:
Requirement
:
 
Purchase decision
:
 
Required delivery period
:
(weeks from PO date)
Country of installation/use
:
 
Nearest airport
:
 
Nearest seaport
:
 
Notes
:
 
Security Code
:
   
If you are interested in any other Product, please click one of the following links!


* These are general feature and are liable to change on subsequent revision and updation without prior notice.